Share:
May. 25, 2026
Recently, Phase I of Astana Light Rail in Kazakhstan, the first urban light rail in Central Asia, has officially opened to traffic. As a vital north-south transport artery, it sets new standards for Central Asian rail transit with core technologies including GoA4 fully automatic driverless operation and extreme cold resistance. Supported by Saisi high-precision clock synchronization system, nanosecond-level coordinated operation is realized across the line. Superior time-frequency strength boosts the global expansion of Saisi intelligent manufacturing.
1. Astana Light Rail: Central Asia's First Fully Automatic Driverless Light Rail
Official sources confirm that Phase I of the light rail was put into formal operation on May 16 local time. Stretching 22.4 kilometers with 18 stations, the route connects the international airport, administrative core area, cultural and tourist landmarks and other key urban hubs. It delivers a daily passenger capacity of over 200,000 trips, greatly optimizing Astana's public transport system.
2. Saisi Clock Synchronization System: Nanosecond Core Support for Astana Light Rail
A unified time benchmark is essential for safe scheduling and coordinated rail operation. The GoA4 fully automatic operation mode enables unmanned control over train standby, startup, departure and docking, relying entirely on precise time synchronization of signal, vehicle and platform systems.
As a professional high-end time-frequency technology enterprise, Saisi customized a dedicated full-line clock system drawing on profound technical expertise and abundant global rail project experience.
The dual-mode satellite timing structure achieves timing accuracy up to 30 nanoseconds, meeting comprehensive synchronization requirements of smart light rail. Full redundant backup design for power supply, clock signals and signal ports guarantees steady continuous equipment operation. Compatible with mainstream NTP and PTP protocols, it builds an integrated time synchronization network covering control centers, stations, depots and running trains.
Certified by CE, the products comply with international specifications. Equipped with a unified network management platform, it supports remote maintenance and intelligent monitoring, ensuring global adaptability and reliable performance.
3. Expanding Layout, Saisi Illuminates Global Rail Transit Networks
The commissioning of Astana Light Rail represents Saisi's steady progress in the time-frequency industry. Saisi clock synchronization solutions have been widely applied across Asia, Africa, Europe and America, covering Mexico Metro, Ethiopia-Djibouti Railway, Jakarta-Bandung High-Speed Railway, Bogota Metro and Astana Light Rail, delivering accurate, stable and reliable Saisi precision to global rail networks.
Related Case
Recently, the results of China Mobile's 2025-2027 synchronous network equipment centralized procurement were announced. Saisi won the top overall score with its core technological advantages, officially becoming a key partner driving the' heartb
May 25, 2026
Recently, the first two trains for Bogotá's first metro line, Line 1, officially rolled off the assembly line and were delivered. As the sole supplier of clock synchronization products and solutions for the line
May 25, 2026
Saisi Global Distributed Data Center PTP Solution: Empowering Alibaba Cloud to Accelerate the Construction of a "Unified Global Cloud Computing Network"
May 25, 2026
Saisi × China Three Gorges Corporation | Saisi Provides Time Synchronization System for CTG Power
China Three Gorges Corporation (CTG) and its controlled subsidiary China Yangtze Power Co., Ltd. (CYPC) — the world’s largest listed hydropower company, which owns and operates hydropower stations including the Three Gorges
May 25, 2026
Recently, extreme weather events have occurred frequently, and weather warnings have become particularly important. The China Meteorological Science Research Institute, as a core research institution directly under the China Meteorological Administration,
May 25, 2026
Recently, the Nanning-Chongzuo section of the Nanning-Pingxiang High-Speed Railway has been officially put into operation. Saisi provided high-precision clock systems for all 5 stations on the Nanchong section, ensuring stable operation of the New Interna
May 25, 2026
Recently, the time servers supplied by Saisi for the terminal buildings of Lijiang Sanyi International Airport have been successfully installed and commissioned. The equipment will ensure unified time calibration for all airport information systems and su
May 25, 2026
In 2023, Saisi supplied multiple sets of 5G synchronous network clock devices to China National Nuclear Corporation's Fuqing, Changjiang, Qinshan, and Tianwan nuclear power plants. These devices provided precise and reliable time benchmarks for the 5
May 25, 2026
Saisi × Chuzhou-Nanjing Intercity Railway | Saisi Clock System Empowers Intercity Transportation
Recently, the Chuzhou section of the Chuzhou-Nanjing Intercity Railway, China's first interprovincial intercity railway, was officially opened to traffic. Saisi clock system contributes to the construction of a multi-level transportation system in th
May 25, 2026
Saisi × Nanning–Yulin Railway | Saisi Time Servers Secure the Safe and Efficient Operation
As a 350 km/h high-speed railway fully invested and constructed by Guangxi, the Nanning–Yulin Railway crosses karst landforms, with a bridge-tunnel ratio of over 80% across the entire line. The complex geological conditions and high-speed operation scenar
May 25, 2026
Related products
E - Mail
Call Me
+86 173 6733 7390
Add.
No. 1376, Shunze Road, Nanhu District, Jiaxing City, Zhejiang Province