Share:
Apr. 27, 2026
As a 350 km/h high-speed railway fully invested and constructed by Guangxi, the Nanning–Yulin Railway crosses karst landforms, with a bridge-tunnel ratio of over 80% across the entire line. The complex geological conditions and high-speed operation scenarios bring dual challenges to time synchronization products.
In the harsh environment of karst terrain and dense tunnel groups, satellite signals are easily blocked, causing traditional clock systems to fail in delivering stable, high-precision time service. Meanwhile, trains traveling at 350 km/h cover nearly 100 meters per second. A mere 1-second time offset in train dispatching, signaling and power supply systems may directly lead to line-wide scheduling disorder and threaten railway operation safety.
Meeting the stringent time synchronization requirements of the Nanning–Yulin Railway, Saisi time servers feature nanosecond-level synchronization accuracy (one billionth of a second) and holdover performance better than ±0.5μs@1day. They build a full-coverage smart time network for the railway, fully guaranteeing the efficient operation of all trains.
The Saisi time servers deployed on the Nanning–Yulin Railway adopt digital phase-locked loop technology and independent FPGA-based holdover algorithms. As professional time synchronization devices, they deliver high-precision, highly reliable time and frequency reference signals for rail transit systems. Fully certified by multiple authoritative institutions, the products boast excellent environmental adaptability.
As Nanning–Yulin high-speed trains travel through the urban clusters of southeastern Guangxi at 350 km/h, Saisi time servers silently safeguard the safe operation of every train.
With rail transit advancing rapidly toward intelligence and networking, the time service system has evolved from the time hub of rail lines into a core neural node of the smart transportation network.
Empowering the 350 km/h Nanning–Yulin High-Speed Railway, Saisi time servers inject nanosecond-level clock heartbeat into the project, marking another milestone for Saisi in the rail transit industry.
On the global stage, Saisi clock systems have been widely applied in numerous world-class rail transit megaprojects: from Mexico Metro Line 1 (one of the world’s top 10 classic PPP cases) and Ethiopia-Djibouti Railway (Africa’s first electrified railway), to the Jakarta-Bandung High-Speed Railway (a landmark high-speed rail project in Southeast Asia). With professional time synchronization technology, Saisi keeps raising the precision standard for global smart transportation.
Looking ahead, Saisi will drive the digital upgrading of rail transit with steady clock heartbeat. Expanding from equipment-level time service to systematic collaboration, and from domestic benchmarks to global layout, Saisi will continue to deliver higher-precision, more stable and reliable products and solutions, empowering the rail transit industry to achieve deeper digital and intelligent transformation.
Previous: Saisi × Daying Middle School × Yucai Middle School | Saisi Clock System Ensures Accurate and Unified Time Signals for Daying Middle School and Yucai Middle School
Next: Saisi × Liaoyang Petrochemical | Saisi Facilitates the Upgrade & Renovation of Time Synchronization System for Liaoyang Petrochemical
Related Case
Recently, the Saisi clock system has been officially put into operation at Nanjing Dongshan Primary School, delivering precise synchronous time service for the campus’s internal systems. During an inspection visit, leaders from the Education Bureau highly
Apr 27, 2026
Recently, the Nanning-Chongzuo section of the Nanning-Pingxiang High-Speed Railway has been officially put into operation. Saisi provided high-precision clock systems for all 5 stations on the Nanchong section, ensuring stable operation of the New Interna
Apr 27, 2026
Recently, Zhejiang Saisi provided a batch of high-precision master-slave clock equipment for Huoshan County Sports Center in Anhui Province, contributing to the construction of an accurate and stable smart sports venue.
Apr 27, 2026
Recently, the time servers supplied by Saisi for the terminal buildings of Lijiang Sanyi International Airport have been successfully installed and commissioned. The equipment will ensure unified time calibration for all airport information systems and su
Apr 27, 2026
Saisi × Jingzhou Citizen Home | Application of Saisi Time Servers in Smart Cities
Recently, Saisi supplied a batch of time servers for Jingzhou Citizen Home, a landmark project in Jingzhou, supporting the development of Jingzhou as a smart city.
Apr 27, 2026
Recently, the clock system developed by Zhejiang Saisi has been officially put into operation at Sichuan Daying Middle School and Chongqing Yucai Middle School, delivering accurate and unified time synchronization signals for teachers, students and standa
Apr 27, 2026
Recently, the first two trains for Bogotá's first metro line, Line 1, officially rolled off the assembly line and were delivered. As the sole supplier of clock synchronization products and solutions for the line
Apr 27, 2026
Saisi × Qitai Airport|SaiTime Clock System Precisely Supports Qitai Airport
On August 8, Qitai Jiangbulake Airport—the first civil transport airport in Changji Hui Autonomous Prefecture, Xinjiang—officially took off! SaiTime high-precision clock system has provided precise timing support to help Qitai Airport accelerate the high-
Apr 27, 2026
Related products
E - Mail
Add.
No. 1376, Shunze Road, Nanhu District, Jiaxing City, Zhejiang Province